Board or Timeline: which one for this project?

Download this page: PDF · Markdown

Project Checklist gives you several ways to look at a project. Two of them are where you'll spend your time, and one question tells you which.

You've marked a job as a project. There are a few ways to look at it now, and two of them are where you'll actually spend your time — the Board and the Timeline. It isn't obvious which one you want.

There's one question that sorts it, and you can answer it in about five seconds.

Does the order matter?

That's it. That's the whole question.

Think about the work in this project. Does it have to happen in a particular sequence, or could you tackle any part of it on any day?

One question decides the view. If the order matters, the Timeline. If it does not, the Board. Does the order matter? YES NO Start with the Timeline The work has a spine. Each task waits on the one before it, so a slip moves everything behind it. Start with the Board To doDoingDone The work is a pile. Any order will do. What you need to know is what's done and what's stuck.
Five seconds. Sequence, so the Timeline. Pile, so the Board. Both views show the same tasks, so nothing is lost if you pick the other one.

If the order matters, start with the Timeline

Some work has a spine. You can't waterproof before the rough-in. You can't connect to the grid before the inspection passes. One thing has to finish before the next can start, and if something slips, everything behind it slips too.

That's what the Timeline is for. Each task becomes a bar on a calendar, so you can see:

  • how long the whole project runs
  • what's happening in which week
  • which tasks are waiting on other tasks
  • what a delay actually costs you

If there's a handover date, or subbies who need to be booked in the right order, you want the Timeline.

If the order doesn't matter, start with the Board

Other work is just a pile. Thirty defects to clear before handover. Forty sites to inspect this quarter. A maintenance contract's worth of callouts. Any of it could be done in any order — what you actually need to know is what's finished, what someone's on, and what's stuck.

That's the Board. Tasks sit in lists, and you move them along as the work progresses. It's the view that answers "where are we up to?" at a glance.

If you've used Trello or a whiteboard with sticky notes, you already know how this works.

Some examples

The workWhich oneWhy
Bathroom renovationTimelineDemo, rough-in, waterproof, tile, fit-off. The sequence is fixed.
Handover defect listBoardThirty items, any order. You just need them cleared.
Solar install across three visitsTimelineAssessment, then approval, then install, then inspection.
Quarterly compliance round, 40 sitesBoardEvery site is independent. It's about what's done.
Switchboard upgrade with an outage windowTimelineThe date is fixed and everything works back from it.
Warranty callbacks on a finished buildBoardThey arrive when they arrive.

Most projects are actually both

Here's the thing nobody tells you: real projects usually have both kinds of work in them.

A bathroom renovation has a strict sequence up front — you genuinely cannot reorder demo, rough-in, waterproofing and tiling. But once the work is done, you've got a defect list, and that's just a pile of small jobs in no particular order.

Same project. Two shapes of work. Both in Project Checklist at the same time.

You don't have to choose. Every task lives in one place, and the Board and the Timeline are two ways of looking at the same tasks. Nothing is duplicated. Nothing needs syncing. Change something in one view and it's changed in the other, because it was never two things to begin with.

So the practical answer for most projects is: plan the sequenced part in the Timeline, work the day-to-day on the Board, and switch whenever it suits you.

You can't get this wrong

Because the views are just lenses on the same work, picking the "wrong" one costs you nothing. You switch views from the dock and everything's still there.

The dock is the small row of icons floating over the board: Hover it and it opens out; click an icon to switch. If it's ever in your way, drag it — it snaps to whichever edge you let go near, and stays there.

The dock starts at the top edge, open. Dragged to the left, right or bottom edge it folds to a small tab that opens when you hover. BoardTimelineCalendarTableStaffMap STARTS HERE: TOP EDGE, ALWAYS OPEN DRAG TO ANOTHER EDGE Folded to a tab. Hover: it opens. Move away: it folds. Left, right or bottom edge: the dock folds away and opens on hover. Top edge: it stays open.

So don't overthink it. If the project has a deadline and a sequence, open the Timeline. If it's a list of things that need doing, open the Board. You'll know within a minute whether the other one suits you better.

The other views

Two views is where you'll live. The rest are there for when you want something specific:

  • Calendar — the plan laid out on a month, week or day. Handy for booking work in and for spotting the weeks that are too full.
  • Table — every task as a row, sortable, with the columns you choose. This is the one to open when someone asks a question the Board can't answer at a glance.
  • Staff (Board) — the same board, grouped by who the work belongs to.

And if your project has child jobs, you get one more:

  • Map — the whole project drawn as a branching picture. The job at the root, branching out to its lists and its child jobs, each of those branching to its own lists. It answers "what is this project actually made of", which is a hard thing to see any other way once the work is spread across several jobs.

You don't need any of them to get started, and none of them change the answer to the question above.